{"id":2035,"date":"2026-11-19T12:16:09","date_gmt":"2026-11-19T12:16:09","guid":{"rendered":"https:\/\/www.langleyholdings.com\/pt-pt\/?p=2035"},"modified":"2026-11-24T12:51:42","modified_gmt":"2026-11-24T12:51:42","slug":"rethinking-data-centre-power-infrastructure-in-the-uk","status":"publish","type":"post","link":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/","title":{"rendered":"Rethinking Data Centre Power Infrastructure in the UK"},"content":{"rendered":"<p><strong>The UK Government\u2019s new <a href=\"https:\/\/www.gov.uk\/government\/publications\/data-centre-covenant\/the-data-centre-covenant?utm_source=chatgpt.com\">Data Centre Covenant<\/a>, announced in its October 2026 Budget, signals a shift in how data centres are developed and the role they can play in supporting the UK\u2019s energy future and local communities. With greater government backing for strategically important projects, including faster grid connections, comes a clear expectation: data centres must deliver more than digital infrastructure. They must also contribute to energy security, environmental sustainability, local investment and wider economic growth.<\/strong><\/p>\n<p>The message is clear: the UK needs more data centre capacity to support the growth of AI and its wider digital economy, but this growth must be responsible and deliver tangible benefits to the communities hosting it.<\/p>\n<p><strong>A New Expectation for UK Data Centres<\/strong><\/p>\n<p>For many communities, the arrival of a data centre is not necessarily welcomed. The public perception is often of a large industrial building consuming vast amounts of electricity and water, generating noise and emissions, and occupying valuable land. What does the community receive in return? A relatively small number of permanent jobs and little direct benefit to the local economy.<\/p>\n<p>The Covenant seeks to change this perception. It places greater emphasis on transparency, requiring strategic data centres to report their energy and water consumption, demonstrate efficiency and consider how their developments can provide lasting local benefits. Local Benefit Plans, investment in education and apprenticeships, and greater engagement with communities are all part of this changing expectation.<\/p>\n<p><strong>Addressing the Power Challenge<\/strong><\/p>\n<p>However, there is another significant challenge: power. The Government wants to accelerate grid connections, but electricity network infrastructure cannot be reinforced overnight. New substations, transmission infrastructure and distribution networks all have significant development and delivery timescales. For some developments, alternative arrangements will be needed to bridge the gap between the need for power and its availability from the grid. The Covenant recognises this by proposing a tightly controlled framework for temporary onsite generation for exceptionally strategic projects.<\/p>\n<p>But what if bringing power to site could offer much more than simply supplying the data centre?<\/p>\n<p><strong>Turning Energy into Community Value<\/strong><\/p>\n<p>Deploying Bergen\u2019s medium-speed gas engines, coupled with Marelli alternators, provides an opportunity to develop highly efficient combined heat and power installations. Rather than allowing valuable thermal energy to go unused, it can be recovered and supplied to local district heating networks, providing heat to homes, schools, hospitals and other public buildings.<\/p>\n<p>There is also an important environmental consideration in the choice of generation technology: its ability to evolve as fuel availability and carbon-reduction objectives change. Bergen\u2019s medium-speed engines offer a pathway towards progressively lower-carbon fuel sources, starting with natural gas and moving towards sustainably sourced biomethane, hydrogen blends and ultimately 100% hydrogen. This provides the opportunity to transition the fuel supply over the life of the installation, rather than locking the site into today\u2019s fuel mix. As renewable gases and low-carbon hydrogen become more widely available, the same generation infrastructure could support increasingly ambitious emissions targets.<\/p>\n<p>There is also an opportunity to develop symbiotic local industries. Commercial greenhouses, breweries and other businesses with significant thermal requirements can benefit from a reliable local energy source. In greenhouse applications, treated engine exhaust can also provide recovered CO\u2082 to support crop growth and improve productivity. These are not theoretical concepts; Bergen engines already have a history of delivering <a href=\"https:\/\/www.bergenengines.com\/references\/30th-greenhouse-from-bergen-engines\/?utm_source=chatgpt.com\">CHP solutions to greenhouse operators<\/a>.<\/p>\n<p>The benefits need not stop at heat. A properly designed installation could incorporate renewable generation, energy storage and grid-parallel operation. Subject to network capacity, connection agreements and appropriate control arrangements, surplus generation could be exported or dispatched to support local electricity requirements during periods of network constraint. The data centre becomes more than a major electricity consumer; it has the potential to become an active participant in the local energy system.<\/p>\n<p><strong>Managing the Demands of AI<\/strong><\/p>\n<p>This requires a different approach to power infrastructure, particularly as AI workloads introduce increasingly rapid and significant changes in electricity demand.<\/p>\n<p>Piller Power Systems\u2019<a href=\"https:\/\/www.piller.com\/product\/shieldx-dynamic-power-stabilisation\/?utm_source=chatgpt.com\"> ShieldX Dynamic Power Stabilisation technology<\/a> offers a way to manage these fluctuations, providing rapid, bidirectional power response between the generation plant and the data centre. Designed for both grid-connected and islanded operation, it can help stabilise the power plant against demanding AI load profiles, reducing the need to oversize generation and supporting a more controlled electrical interface with the grid. Complemented by Piller\u2019s UPS systems, the result is an integrated approach to both site-level power stability and protection of critical IT loads.<\/p>\n<p><strong>Supporting Grid Stability and Resilience<\/strong><\/p>\n<p>Data centre operations are also having to adapt to changing expectations from network operators. Fault Ride Through (FRT) requirements are already appearing in some connection offers, requiring data centres to remain connected during defined network voltage disturbances rather than disconnecting immediately as they might traditionally have done. This is an important change in how large electricity consumers interact with the grid. As AI infrastructure increases the scale and concentration of electrical demand, the ability to withstand disturbances and recover demand in a controlled manner becomes increasingly important to overall network stability. Power conditioning technology can play an important role in managing these events while protecting the critical IT infrastructure.<\/p>\n<p>Of course, onsite generation must be designed responsibly. Fuel selection, emissions controls, operating arrangements and the practical availability of local heat users all matter. The objective is not simply to move the environmental impact of a data centre from the electricity network to the local community, but to develop an integrated solution that delivers measurable benefits.<\/p>\n<p><strong>Rethinking the Role of Data Centres<\/strong><\/p>\n<p>Data centres are now fundamental to almost every aspect of modern life, from banking and communications to healthcare, industry and public services. Their importance to the UK economy and national resilience will only increase.<\/p>\n<p>The question should no longer be simply how we get enough power to build the next generation of data centres. It should be how we design the power infrastructure to deliver value beyond the data centre itself.<\/p>\n<p>What if the data centre could become an energy asset for the community, rather than simply another consumer of the grid? One that provides reliable electricity, supports local heating requirements, helps stabilise the network and progressively reduces its carbon footprint as cleaner fuels become available.<\/p>\n<p>By bringing together Bergen\u2019s engines, <a href=\"https:\/\/www.marellimotori.com\/generators\/?utm_source=chatgpt.com\">Marelli\u2019s generators<\/a> and Piller\u2019s power conditioning and UPS technologies, there is an opportunity to turn the challenge of constrained grid capacity into something much more positive: resilient, adaptable power infrastructure that supports AI, strengthens energy security and delivers lasting benefits to the communities in which it operates.<\/p>\n<p><strong>Data centre power infrastructure could be part of the solution to the UK\u2019s wider energy challenge \u2013 contact Langley Power Solutions to understand more.<\/strong><\/p>\n<p>Email: \u00a0<a href=\"mailto:PowerOn@langleyholdings.com\">PowerOn@langleyholdings.com<\/a><\/p>\n<hr \/>\n<p><strong>About<\/strong><\/p>\n<p>Langley Power Solutions, a division of Langley Holdings plc, brings together three world-class engineering businesses: <a href=\"https:\/\/www.bergenengines.com\/\">Bergen Engines<\/a> of Norway, <a href=\"https:\/\/www.marellimotori.com\/\">Marelli Motori<\/a> of Italy and gold-standard <a href=\"https:\/\/www.piller.com\/\">Piller Power Systems <\/a>of Germany. Combining expertise in power generation, electrical machines, power conditioning and critical power protection, the division delivers integrated, scalable and resilient power infrastructure for mission-critical applications. With a growing focus on the rapidly expanding AI data centre sector, Langley Power Solutions provides innovative <a href=\"https:\/\/www.langleyholdings.com\/grid-free-power\/\">behind-the-meter<\/a> power solutions designed to meet the demands of next-generation digital infrastructure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The UK Government\u2019s new Data Centre Covenant, announced in its October 2026 Budget, signals a shift in how data centres are developed and the role they can play in supporting the UK\u2019s energy future and local communities. With greater government backing for strategically important projects, including faster grid connections, comes a clear expectation: data centres [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2036,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[23],"class_list":["post-2035","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-langley-holdings"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rethinking Data Centre Power Infrastructure in the UK - Portugu\u00eas<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rethinking Data Centre Power Infrastructure in the UK - Portugu\u00eas\" \/>\n<meta property=\"og:description\" content=\"The UK Government\u2019s new Data Centre Covenant, announced in its October 2026 Budget, signals a shift in how data centres are developed and the role they can play in supporting the UK\u2019s energy future and local communities. With greater government backing for strategically important projects, including faster grid connections, comes a clear expectation: data centres [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/\" \/>\n<meta property=\"og:site_name\" content=\"Portugu\u00eas\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-19T12:16:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-24T12:51:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.langleyholdings.com\/pt-pt\/wp-content\/uploads\/sites\/8\/2026\/11\/Keith-Blog-Piller-News-V2.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1110\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"louise\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"louise\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/\"},\"author\":{\"name\":\"louise\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/#\\\/schema\\\/person\\\/06621020ff0fd78a8b19a48e81dd3fe6\"},\"headline\":\"Rethinking Data Centre Power Infrastructure in the UK\",\"datePublished\":\"2026-11-19T12:16:09+00:00\",\"dateModified\":\"2026-11-24T12:51:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/\"},\"wordCount\":1203,\"image\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/11\\\/Keith-Blog-Piller-News-V2.webp\",\"articleSection\":[\"Langley Holdings\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/\",\"url\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/\",\"name\":\"Rethinking Data Centre Power Infrastructure in the UK - Portugu\u00eas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/11\\\/Keith-Blog-Piller-News-V2.webp\",\"datePublished\":\"2026-11-19T12:16:09+00:00\",\"dateModified\":\"2026-11-24T12:51:42+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/#\\\/schema\\\/person\\\/06621020ff0fd78a8b19a48e81dd3fe6\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/11\\\/Keith-Blog-Piller-News-V2.webp\",\"contentUrl\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/11\\\/Keith-Blog-Piller-News-V2.webp\",\"width\":1110,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/2026\\\/11\\\/19\\\/rethinking-data-centre-power-infrastructure-in-the-uk\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rethinking Data Centre Power Infrastructure in the UK\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/\",\"name\":\"Portugu\u00eas\",\"description\":\"Portugu\u00eas\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/#\\\/schema\\\/person\\\/06621020ff0fd78a8b19a48e81dd3fe6\",\"name\":\"louise\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g\",\"caption\":\"louise\"},\"url\":\"https:\\\/\\\/www.langleyholdings.com\\\/pt-pt\\\/blog\\\/author\\\/louise\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rethinking Data Centre Power Infrastructure in the UK - Portugu\u00eas","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/","og_locale":"pt_PT","og_type":"article","og_title":"Rethinking Data Centre Power Infrastructure in the UK - Portugu\u00eas","og_description":"The UK Government\u2019s new Data Centre Covenant, announced in its October 2026 Budget, signals a shift in how data centres are developed and the role they can play in supporting the UK\u2019s energy future and local communities. With greater government backing for strategically important projects, including faster grid connections, comes a clear expectation: data centres [&hellip;]","og_url":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/","og_site_name":"Portugu\u00eas","article_published_time":"2026-11-19T12:16:09+00:00","article_modified_time":"2026-11-24T12:51:42+00:00","og_image":[{"width":1110,"height":720,"url":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-content\/uploads\/sites\/8\/2026\/11\/Keith-Blog-Piller-News-V2.webp","type":"image\/webp"}],"author":"louise","twitter_card":"summary_large_image","twitter_misc":{"Written by":"louise","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#article","isPartOf":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/"},"author":{"name":"louise","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/#\/schema\/person\/06621020ff0fd78a8b19a48e81dd3fe6"},"headline":"Rethinking Data Centre Power Infrastructure in the UK","datePublished":"2026-11-19T12:16:09+00:00","dateModified":"2026-11-24T12:51:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/"},"wordCount":1203,"image":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#primaryimage"},"thumbnailUrl":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-content\/uploads\/sites\/8\/2026\/11\/Keith-Blog-Piller-News-V2.webp","articleSection":["Langley Holdings"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/","url":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/","name":"Rethinking Data Centre Power Infrastructure in the UK - Portugu\u00eas","isPartOf":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#primaryimage"},"image":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#primaryimage"},"thumbnailUrl":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-content\/uploads\/sites\/8\/2026\/11\/Keith-Blog-Piller-News-V2.webp","datePublished":"2026-11-19T12:16:09+00:00","dateModified":"2026-11-24T12:51:42+00:00","author":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/#\/schema\/person\/06621020ff0fd78a8b19a48e81dd3fe6"},"breadcrumb":{"@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#primaryimage","url":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-content\/uploads\/sites\/8\/2026\/11\/Keith-Blog-Piller-News-V2.webp","contentUrl":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-content\/uploads\/sites\/8\/2026\/11\/Keith-Blog-Piller-News-V2.webp","width":1110,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/2026\/11\/19\/rethinking-data-centre-power-infrastructure-in-the-uk\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.langleyholdings.com\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Rethinking Data Centre Power Infrastructure in the UK"}]},{"@type":"WebSite","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/#website","url":"https:\/\/www.langleyholdings.com\/pt-pt\/","name":"Portugu\u00eas","description":"Portugu\u00eas","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.langleyholdings.com\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Person","@id":"https:\/\/www.langleyholdings.com\/pt-pt\/#\/schema\/person\/06621020ff0fd78a8b19a48e81dd3fe6","name":"louise","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g","caption":"louise"},"url":"https:\/\/www.langleyholdings.com\/pt-pt\/blog\/author\/louise\/"}]}},"_links":{"self":[{"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/posts\/2035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/comments?post=2035"}],"version-history":[{"count":2,"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/posts\/2035\/revisions"}],"predecessor-version":[{"id":2038,"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/posts\/2035\/revisions\/2038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/media\/2036"}],"wp:attachment":[{"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/media?parent=2035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.langleyholdings.com\/pt-pt\/wp-json\/wp\/v2\/categories?post=2035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}